Engineering, Procurement, Construction, Installation and commissioning of Tailing Dam with 23m height and 2500m length
Tailing transmission pipe line (4 lines) with 9 km length
Pump station with 8.5 km water transmission line for reclaim water
Country: Iran
Customer : Golgohar Mining and Industrial Complex
Progress: Site mobilization and Engineering